Approve the exact proof, not the idea of the design.

A correct logo can sit beside an old event date. Review the whole proof against the current order record before approving it.

By ANCO Apparel & Uniforms · Published · Updated

Short answer: Compare the exact proof version with the confirmed garment and artwork brief. Check wording, dates, names, dimensions, locations and which garments use each variant. Resolve open questions and record one authorized approver and date. A screen proof communicates layout; it is not a physical colour-match guarantee.

Part of Artwork, production and ordering. Planning an order? Explore Custom Apparel in Calgary.

Check six parts of the proof

Final proof review
PartCompare againstDo not approve until
VersionThe latest requested artwork revisionThe file or proof identifier is unambiguous
WordingConfirmed names, dates, spelling and approved logosEvery content owner has resolved their part
GarmentExact style, colour and fit rangesThe proof represents the intended garments
DimensionsProposed physical artwork width and height, with unitsThe measurements are stated and understood
LocationsEach front, back or other approved locationPosition references and construction questions are resolved
AssignmentsThe current quantity and artwork-variant recordEach garment row has the correct design

Record the exact proof, unresolved items, requested corrections and final approver in an editable checklist.

Download the proof-approval checklist (Markdown)

No form or email required.

Read the dimensions, not only the picture

A generic garment mockup may not show the exact scale on every size. Confirm the written dimensions and position references, especially when a hood, pocket or smaller garment changes the usable area. Ask about anything the proof leaves unspecified.

The STAHLS artwork specification distinguishes screen appearance from its printed output and identifies product-specific artwork limits. Do not infer an exact physical colour match from a monitor preview. If colour expectations are critical, discuss how they will be assessed before approval.

Illustrative example: the logo is right, the date is old

A correction requires a new version

Illustrative example · Not a documented customer order

A coordinator sees the correct logo on a proof but notices the previous event date. They list the date correction and withhold final approval. The revised proof receives a new version identifier.

The coordinator then checks the complete revised proof—logo, date, names, dimensions, garment and locations—rather than looking only at the corrected date. Approval names that new version so an earlier image in the conversation cannot be mistaken for the accepted file.

Keep an editable artwork master for revisions. Adobe's outline-text explanation notes that converted text becomes paths. Correcting the editable source is different from typing a note over a preview image.

Make the approval traceable

  • Name one person authorized to approve the order.
  • List unresolved questions separately and clear them before final approval.
  • Record the proof version, approval date and approver.
  • Keep the approved garment breakdown with the proof.
  • Treat a later change as a new request and ask whether it can be accommodated.
  • Retain the approved record for any future reorder.

Use this checklist when working through an ANCO custom-apparel order. It prepares a clear decision; it does not define a cancellation, revision or production policy.

If the original file is still uncertain, return to artwork file preparation. Reconcile the final garment assignments with the group-size CSV worksheet before signing off.

Sources and scope

Manufacturer examples explain specific products and do not confirm ANCO stock, equipment or suppliers. ANCO reviews the proposed garment, artwork and order before confirming suitability.

A few practical answers.

These answers are a starting point. Your garment, artwork and order details determine the final conversation.

Does approving the proof guarantee the monitor colour?

No. A screen preview is not a physical colour-match guarantee. Discuss important colour expectations and the proposed way to assess them before approval.

Can I change something after approving?

Ask ANCO about the current order stage and the requested change. Do not assume an edited file or message automatically changes approved production.

Turn the guide into a clear order brief.

Tell us what you are planning and we’ll help you work through the details.